StacksVerified U.S. regulatory reference

40 CFR Part 63, Table 1

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov

As stated in § 63.2998(c), you must comply with the minimum requirements for monitoring and recordkeeping in the following table:

You must monitor these parameters:At this frequency:And record for the monitored parameter:
1. Thermal oxidizer temperature 1 4Continuously15-minute and 3-hour block averages.
2. Other process or control device parameters specified in your OMM plan 2 4As specified in your OMM planAs specified in your OMM plan.
3. Urea-formaldehyde resin solids application rate 4On each operating day, calculate the average lb/h application rate for each product manufactured during that dayThe average lb/h value for each product manufactured during the day.
4. Resin free-formaldehyde content 4For each lot of resin purchasedThe value for each lot used during the operating day.
5. Loss-on-ignition 3 4Measured at least once per day, for each product manufactured during that dayThe value for each product manufactured during the operating day.
6. UF-to-latex ratio in the binder 3 4For each batch of binder prepared the operating dayThe value for each batch of binder prepared during the operating day.
7. Weight of the final mat product per square (lb/roofing square) 3 4Each product manufactured during the operating dayThe value for each product manufactured during the operating day.
8. Average nonwoven wet-formed fiberglass mat production rate (roofing square/h) 3 4For each product manufactured during the operating dayThe average value for each product manufactured during operating day.

1 Required if a thermal oxidizer is used to control formaldehyde emissions.

2 Required if process modifications or a control device other than a thermal oxidizer is used to control formaldehyde emissions.

3 These parameters must be monitored and values recorded, but no operating limits apply.

4 You are not required to monitor or record these parameters during periods when using a non-HAP binder. If you do not monitor these parameters during periods when using a non-HAP binder, you must record the dates and times that production of mat using the non-HAP binder began and ended.

[84 FR 6697, Feb. 28, 2019]